Testing/ Pre Commmissioning Services
MV/HV/EHV Equipments
  • Power Transformers 110/11 KV, 12.5/16 MVA
    • Measurement of IR Value
    • Measurement of P I Value
    • Measurement of Winding Resistance
    • Short Circuit Test
    • Oprn Circuit Test
    • Magnetic Core balance Test
    • Voltage Radio Test
    • Oil BDV & Acidity Test
    • Checking the function of OTI, WTI, OSR, MOG, PRV Relays
  • Breakers
    • Measurement of IR values:
      • - At opening position, At closing position
    • Measurement of Conact Resistance
    • Breaker Opening and Closing Time
  • All type of Relays
  • Cables & Busducts
    • Insulation Resistance
    • High-Volt Test
    • High Pot Test
  • Panels
    • Bus bar Insulation Resistance & HV Test
    • Differential Stability Test
    • REFR stability Test
    • Internal wiring checking
    • Scheme Checking
    • AC Circuit & DC Circuit
    • Panel interlock checking
    • RTCC & OLTC panels
    • NGR panels
    • Relay Panels
    • Control panels
    • LAPT panels
    • AC/ DC Distribution Panles
Testing of Substation Equipmets
  • Current Transformers
    • Ratio Test at CT Terminal and Relay Terminal
    • Polarity Test
    • Magnetising Characteristic
    • Measurment of IR value
    • Winding Resisting Measurement
  • Voltage Transformers
    • Ratio Test
    • Polarity Test
    • Measurment of IR value
    • Measurement of Winding Resistance
  • Relays
    • Operation test for all Relays
  • Lightning Arrester
  • Isolaters
    • Measurement of IR Value
      • - Between same pole at open position
      • - Between each pole and earth at pole condition
      • - Between each pole at closed position
  • Busduct
    • Measurement of IR value and HT test